9.2.2 Electric pump connections

ELECTRIC PUMP

Unit

Terminal board

Terminal

Description

Terminal

Terminal

board

Unit

ELECTRIC PUMP 1

PANEL

See panel

7

Common

2

XC2

KL2

Q-2Rils 485

8

Incorrect phase

sequence

12

9

Pump on demand

14

10

Pump running

16

11

Failure to start

18

Float switch

see float switch

*

Minimum level of

priming tank

2

*

8

Float switch

see float switch

*

Minimum level of

priming tank

2

*

10

* Identify the terminals from the device diagram. In case of alarm, the final contact must be NO.
N.B.:
1) If the priming tank minimum level alarm signal is not used, jumper terminals 2-8 on terminal block XC2 (KL2) in the
Q-2Rils485 panel.

2) If the priming tank minimum level alarm signal is not used, jumper terminals 2-10 on terminal block XC2 (KL2) in the
Q-2Rils485 panel.

9.2.3 Electrical connections of the auxiliary services: valves, jockey pump, drain pump (if present)

VALVE MONITORING

Unit

Terminal board

Terminal

Description

Terminal

Terminal

board

Panel

“Micro-valve”

position switch

See valve switch

21

Flowmeter valve

1

XC2

KL3

Q-2Rils 485

22

10

13

Pump 1 suction

valve

1

XC2

KL2

Q-2Rils 485

14

4

13

Pump 1 delivery

side valve

1

14

6

1) If the flowmeter valve is not used, do not jumper terminals 1-10 on terminal block XC2 (KL3) in the Q-2Rils 485 panel
or do not enable monitoring from QAL 12845.
2) If the suction and/or delivery side valve is not used, jumper terminals 1-4 / 1-6 on terminal block XC2 (KL2) in the Q-

2Rils 485 panel or do not enable monitoring from QAL 12845.

JOCKEY PUMP

Unit

Terminal board

Terminal

Description

Terminal

Terminal

board

Panel

JOCKEY PUMP PANEL

Relay KA1

11

Jockey pump

running

2

XC2

KL3

Q-2Rils 485

14

4

Relay KA2

11

Overload

2

14

6

Important: The jockey pump panel, if present, must be version CP with clean contacts.