2 checking the ceiling of the furnace, 2 controllo cielo della camera di combustione – MCZ Premium 100 Manuale d'uso

Pagina 61

Advertising
background image

61

11.2
CHECKING THE
CEILING OF THE
FURNACE

11.2.1
This should be done at least
once a month.

11.2.2
Open
the FURNACE DOOR (B).

11.2.3
Lighting the interior with a fl ash-
light or when the fi re is on,
check the condition of the
FURNACE CEILING (B).

- If there are holes on the sheet

plate call your Authorized Dealer
immediately to replace the part.

- If the sheet plate is undamaged,

continue to use the oven.

11.2.4
The CHECKING THE CEILING
OF THE FURNACE stage has
been completed.

11.3
For any other MAINTENANCE
operation contact an Authorized
Retailer.

12

MANUTENZIONE ORDINARIA

MAINTENANCE

11.2
CONTROLLO CIELO
DELLA CAMERA
DI COMBUSTIONE

11.2.1
Questa operazione deve essere
effettuata ogni mese.

11.2.2
Aprire lo SPORTELLO CAMERA
COMBUSTIONE (B).

11.2.3
Con una torcia o quando il fuoco
è acceso, verifi care lo stato
della lamiera nel CIELO della
CAMERA DI COMBUSTIONE (B).

- Se s’intravedono dei fori sul-

la lamiera chiamare il Vostro
Rivenditore Autorizzato per la
sostituzione.

- Se la lamiera è in buono stato

continuare ad utilizzarlo.

11.2.4
Il CONTROLLO CIELO DELLA
CAMERA DI COMBUSTIONE,
è terminato.

11.3
Per qualsiasi altra
MANUTENZIONE
STRAORDINARIA, rivolgersi
al Vostro Rivenditore Autorizzato.

B

Advertising