Repairs

As indicated in Disassembly, the element is not subject to

field repair and must be replaced if it is found to be defec-

tive. Similarly if the RF connector in the Series 8890-400 is

damaged it must be replaced.

RF Load Resistor Test

Preparation:

s

Tools: Common hand tools

s

Ohmmeter with an accuracy of ± 1% at 50

ohms.

s

Temperature of the load between 20°C to 25°C

(38°F to 77°F)

Accurate measurement of the dc resistance between the in-

ner and outer conductors of the RF input connector will pro-

vide a good check of the condition of the load resistor.

Checking the dc resistance is simply used to measure a

change in the condition of the resistor over time. The track-

ing of the dc resistance must start before the resistor is first

put into service. When the resistor is checked the measured

resistance should be within a range of 49 to 52.5 ohms. Gen-

erally, if the value exceeds this allowance, the load resistor

may need replacement. Perform the following steps and rec-

ord the value for future comparison. Check and record the

resistance of the load periodically according to use.

WARNING

Never attempt to disconnect RF equipment from the

transmission line while RF power is being applied.

Leaking RF energy is a potential health hazard.

1. Turn off RF power and interlock circuitry be-

fore any electrical disconnection’s are made.

2. Disconnect the RF coaxial line.

3. Connect the multimeter test leads across the

center and outer conductor of the load resistor.

Refer to figure 9.