Fast & Fluid LEOLUX Manuale d'uso

Pagina 22

Advertising
background image

FAST & FLUID MANAGEMENT srl
A Unit of Idex Corporation











(Fig.18)

Remove the canister lid and place the
proper tool, shown on enclosed picture

(fig.18), on the top of the canister to be
removed.





















(Fig.19)


Turn the tool in anticlockwise direction

until the canister is released (fig.19).



















(Fig.20)














(Fig.21)







Move up the canister until the canister
fasteners will be disengaged and extract

it (fig. 20) out from the rotating table

(fig. 21).





To insert again the canisters in its position, proceed with inverse operating sequence having care to

move the stirring shaft from the top part, in order to centre the bottom part of the stirring shaft into
the relative hole of the rotating table.



1155306D-it,en - 17/03/06

22

Advertising