Commercial peripherals installation – Fast & Fluid LEOLUX NV Manuale d'uso

Pagina 18

Advertising
background image

FAST & FLUID MANAGEMENT srl
A Unit of Idex Corporation

1155495A-it,en - 24/05/07

18

COMMERCIAL PERIPHERALS INSTALLATION



(Fig.7)







1

Æ LCD Power Supply

2

Æ Printer USB cable

3

Æ Printer Power Supply 12V

4

Æ Keyboard PS/2 cable

5

Æ Mouse PS/2 cable








(Fig.10)

To install the LCD, make the VGA
cable (6) pass through the bracket










(Fig.11)

Connect the LCD power supply
cable (1)







(Fig.12)

Fix the LCD by the 4 Allen screws or

button-head screws (depending on
the right threaded length) by means

of an Allen wrench dim. 3 or 2.5








(Fig.13)

To install the keyboard, make the
PS/2 cable pass through the
bracket rectangular pocket







(Fig.14)

Connect the printer to the power
supply and the USB cable








(Fig.15)

Place the Mouse and make the VGA

cable (6), the keyboard (7) and

Mouse cable (8) pass through the
diaphragm hole behind the keyboard

6

1

7

2

3

8

6

7

1

2

3

4

5

Advertising