Caleffi 115 Manuale d'uso

Pagina 18

Advertising
background image

6

11) Insert the newly drilled front insulation onto the anchor pins

and screw down the 4 brackets.

12) Manifolds should be 180° rotated to be installed on the left

version.

13) Before securing the new version of the manifold rotate 180° the

pressure gauge and safety relief valve.

Loosen the components using a wrench and turn them by

hand. Tighten the safety relief valve nut and make the pressure

gauge watertight again.

14) To install the temperature gauges in the reversed version, pull

out the pockets and put in them in the place of the caps on the

rear of the manifold. This operation should be done on the flow

and return manifolds.

Pull out the pocket using a

22 mm hexagonal wrench and

unscrew the opposite cap with

an 18 mm hexagonal wrench.

Invert the positions of the

pocket and cap, and install

(and make watertight) both.

15) Rotate 180° the ball valve handles to open and close in the left

version. This should be done on both ball valves.

Unscrew the upper bolt and

pull out the red control lever.

Rotate 180° the lever and

position it on the extension.

Tighten the screw.

16) Rotate 180° the drain and fill cocks to facilitate opening and

closing during filling and maintenance. This should be done on

the dirt separator valve and drain on the lower manifold.

10) Make holes in the front insulation (the one removed at point 6 in

the instructions), as marked, in order to fit it onto the pins in the

anchoring plate.

Loosen the nut using a 16 mm

hexagonal wrench.

Rotate 180° the valve and

tighten the nut.

Advertising