Installing a 13w3 cable, Slide the stand cover back on the stand – IBM 9519-AW1 Manuale d'uso

Pagina 33

Advertising
background image

26

11. Put the hinge cover back on, making sure that the straight side is at the

top.

12. Insert the three tabs at the top of the cable cover into the slots in the

back of the monitor and push the cover into place.

To obtain the correct cables and/or to get further instructions on installing
them, call the IBM HELPCENTER at the above numbers or contact your
dealer, retailer, or other IBM authorized Servicer.

Installing a 13W3 Cable

13W3 cables are most often used with workstations. To install a 13W3 cable
follows steps 1 through 4 starting on page 24(

Removing the stand and cables

),

then continue with the steps below:

5.

Remove the D-SUB signal cable, if you will not be using it.

6.

Connect the 13W3 signal cable to the 13W3 connector on the back of

the monitor.

7.

Slide the stand cover back on the stand.

8.

Put the hinge cover back on, making sure that the straight side is at the

top.

9.

Insert the three tabs at the top of the cable cover into the slots in the

back of the monitor and push the cover into place.