Checklist, Fuses, Materials – SmartSystem Intelligent Dual Battery Pack Plate (Gold Mount) Manuale d'uso

Pagina 10

Advertising
background image

PLEASE NOTE: SmartPACK can't be seen as an ELECTRONIC

component since it don't make any change to the batteries endings

voltages.

Checklist

It's suitable to follow the following checklist before start working:

1. Ensure that the battery has been properly installed in the appropriate housing.

2. Check that all the knobs are properly tightened checking also every possible

structural play.

3. Check that every power supplying connecter is properly connected and that the

fixing sleeves are tightened enough.

4. Check the fuse on the floating Battery Plate's side

Fuses

In case of accidental short circuit our kit is equipped with a replaceable security fuse for

every battery. If the replacement will be necessary, use only fast-blow fuses 5A.

Materials

SmartPACK is made with the following materials (in various percentages) :

Aluminium 6082

Carbon Fibre

Steel C40

Steel FE360B

Materials and treatments to which the materials have been submitted for fabrication are

compatible with the current

ROHS

directive.

Third parties components have been certified from their respective manufacturers

10

Advertising