3 installing the instrument, Installing the instrument – Eppendorf 5418 R Centrifuge Manuale d'uso

Pagina 18

Advertising
background image

Installation
Centrifuge 5418 / 5418 R
English (EN)

18

4.3

Installing the instrument

Perform the following steps in the sequence described.

1. Let the device warm up to ambient temperature.

2. Check that the mains voltage and frequency match the requirements on the device type plate.

3. Connect the centrifuge to the mains and switch it on using the mains/power switch.

Display is active.

Lid opens automatically

4. Loosen and remove the rotor using the supplied rotor key.

5. Remove the transport protection pad from the motor shaft.

6. Use the details included in the scope of delivery to check that the delivery is complete.

7. Check all parts for any transport damage. Contact your dealer if any damage is found.

8.

Only 5418 R: Insert the condensation water tray at the side of the device into the holder provided.

NOTICE! Damage to electronic components due to condensation.
Condensation can form inside the device after the device has been moved from a cool to a
warmer environment.

5418: Wait for at least 3

hours before connecting the device to the power supply.

Only 5418: Alternative: Let the device heat up for 30 minutes right before a brief transport.

5418 R: Wait for at least 4

hours before connecting the device to the power supply.

NOTICE! Centrifuge 5418 R: compressor damage after improper transport.

Only switch on the centrifuge 4 hours after installation.

Retain the packaging material and the transport protection device for subsequent transport or
storage. See also the instructions relating to transport.

Advertising
Questo manuale è associato alle seguenti prodotti: